SPECIFICATION. In order to assist the goal of advanced coordination, information about planned NYC DOT projects is available via theDOTMapportal within the NYCityMapwebsite. For Further Information: In-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted to the central Permit Office in Manhattan. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. 233 Schermerhorn Street, 11th Floor WORK HOURS ARE 7 AM - 8 PM MON-FRI AND 9 AM - 6 PM SAT. Where applicable, an applicant must submit an original Permit Bond to the Permit Office at the time of permit issuance to cover all costs and expenses that may be incurred by the city as a result of the activity for which the permit is issued or for the purpose of otherwise safeguarding the interests of the city. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. 210 Joralemon Street, 8th Floor Canopy authorizations and permits are required to place a canopy over the sidewalk. (212) 839-8980 THIS STIP IS USED WHEN MORE THAN 50% OF THE INTERSECTION HAS BEEN EXCAVATED OR IF WORK CROSSES THE MIDDLE OF THE INTERSECTION. THIS PERMIT MAY BE EXTENDED ONCE ONLY, FOR A PERIOD OF 14 DAYS AT $40. The first and most expeditious option (see Diagram 2), is by using the DOT on-line NYCStreets Permit Management system. http://mutcd.fhwa.dot.gov back to top N New York 811, Inc. Any work is subject to suspension during an NYC DOT-issued. The NYCDOT Standard Details of Construction have been updated to include the revised H-1011 drawings covering pedestrian ramps. Outlined below are the basic application procedures for Street Opening Permits. Copies may be accepted if approved by the Permit Office in advance. WORK ALLOWED 7 PM TO 6 AM NIGHTLY. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. Tel: 718-220-8500 Staten Island, NY 10301 Office hours: Applications accepted, only from 8:30 AM to 12:30 PM; ONLY FOR CORRECTIVE ACTION FOR SPECIAL EVENTS. PARKING OF NON COMMERCIAL VEHICLES ON THE ROADWAY, SIDEWALK OR WITHIN THE WORK ZONE IS PROHIBITED. DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. COORD. 120-55 Queens Boulevard, Ground Floor, Room G-210 The citys Climate Resiliency Design Guidelines[PDF] provide guidance on height. 120-55 Queens Blvd., Room 201 Ride the Staten Island Ferry. There are separate permit applications for governmental work, Canopy Permits, and permit renewals and re-issuance, all of which are explained later in this chapter. WORK 10AM-3PM TO SET UP WORK AREA INCLUDES SHIFTING MOVING LANE TO CENTER STRIPED AREA AND ESTABLISING WORK ZONE ONCE WORK ZONE ESTABLISHED MAY WORK 24/7 WITHIN WORK ZONE/DRILLING ALL WORK IN ACCORDANCE WITH DRAWING MPT-3 8/28/07. MUST MEET ALL REQUIREMENTS AS SET FORTH IN RTE 9A RECONSTRUCTION PROJECT REPAIR DETAILS FOR REPLACEMENT OF 50 YEARS CONCRETE PAVEMENT AND SIDEWALK DATED 9/7/2001. The term "street" means a public street, avenue, road, alley, lane, highway, boulevard, concourse, parkway, driveway, culvert, sidewalk, crosswalk, boardwalk, viaduct, square or place, except those streets adjacent to any waterfront property designated as a marginal street on a city map. This number should be kept confidential and only used to apply for NYC DOT permits. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. Orders, given orally or in writing, may be issued by the Commissioner to cease and desist work or to perform remedial action. Form must be notarized. All applicable fees will apply. Applicants should indicate on the application, Application for Governmental Work Permit(s), their name and the name of the governmental agency or authority for which they are working. Information on the restoration requirements for sidewalk repairs can be found inChapter 4 Executing Work in the Street. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BUILDING LINE TO BUILDING CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. BETWEEN THE HOURS OF 12:01AM AND 6:00AM. Call before you dig. As shown in the screen image, the pop-up for the "NYC DOT 10 year Capital Plan" layer features a project ID, title, and the fiscal year for which the project is planned, whereas the pop-up for "NYC DOT Protected Streets" includes street name and the date to which protected status extends. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. All public and private actions must comply with all applicable laws, rules, and regulations, not solely those listed below. The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications. A permit is required to place any construction trailer or similar structure in the street. OCMC will release the hold after it reviews the proposed work and adds the permit stipulations. Tel: (212) 669-7817 Division of Traffic Engineering OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 8 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 11 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO NORTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO SOUTH CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO EAST CURB LINE, OCCUPY 20 FOOT WIDTH OF ROADWAY ADJACENT TO WEST CURB LINE. PRIOR TO PERFORMING ANY NON-EMERGENCY WORK WHICH IMPACTS AUTHORIZED PARKING, THE CONTRACTOR SHALL NOTIFY & COORDINATE WITH NYC DOT AUTHORIZED PARKING UNIT AT: BARCLAYS CENTER (ATLANTIC YARDS) EVENTS. If the applicant does not agree with the PM, he or she is informed of the appeals process. Please note that although permits can be submitted, paid for and printed out 24/7, the permit review process occurs only during normal weekday Permit Office hours. SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Manhattan / Central Permit Office THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR SPECIFIC TRAVEL LANE RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. MeetingsRegular coordination meetings allow decision makers to share information and to discuss project difficulties and constraints. Brooklyn, NY 11215 MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. See the state links below for available standard drawings. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. EAU will process the request and fax or call the applicant with an Emergency Street Opening Permit Number, which authorizes the emergency street opening/excavation work. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. The permit to maintain the canopy will remain on hold until after the canopy is installed and inspected. For further information regarding fees, the applicant should refer to Section 2-03 of the Highway Rules. 1/2RES-RESTORE AS PER SKETCH #8 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. THIS STIP IS USED FOR SINGLE CUTS IN THE CURB/PARKING LANE. A separate Occupancy of Sidewalk Permit is required if a minimum of 5 feet cannot be maintained on the sidewalk for unobstructed pedestrian passage. The Standard Sheet Books are also available as compiled .pdf files for the critical letting dates for which they were applicable. The full list of rules and regulations is contained in the Highway Rules, Sections 2-02 and 2-04, and should be consulted before any work is performed on the street. 4. IN SUCH COMMERCIAL DISTRICTS IF MORE THAN 50% OF SIDEWALK FRONTAGE IS REPAIRED/REPLACED THE ENTIRE SIDEWALK MUST BE REPLACED IN CONFORMANCE WITH THE 4.13 C DEPT. Questions regarding permit registration or application processes can be directed to any Permit Office. Office hours: 8:30 AM-4:30 PM. Costs: Shown for each pole or luminaire as a $ symbol, representing relative costs compared to the Standard Street Light (SSL), the Octagonal Pole. The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. Visit the DEC website at the following address to determine the appropriate contact http://www.dec.ny.gov/63.html, Metropolitan Transportation Authority (MTA) Bus Operations 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. More information on this and other "holds" that may be placed on permit applications can be found in, Protected street status for intersections, Active/Future start dates of projects for segments, Active/Future start dates of projects for intersections. THIS STIP IS USED FOR WORK IN NUMEROUS LANES AND THROUGHOUT THE LENGTH OF A BLOCK. ALL OVERDIMENSIONAL CRANE/TRAILERS REQUIRE AN ADDITIONAL PERMIT FROM THE NEW YORK CITY DEPARTMENT OF TRANSPORTATION DIVISION OF BRIDGES. Street resurfacing in progress. MOVEMENT RESTRICTIONS ALONG EXTERIOR STREET WILL BE IN EFFECT DURING ALL SPECIAL EMBARGOS AFFECTING THE AREA SUCH AS THE POPE VISIT AND ALL STAR GAME. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. WORK ALSO ALLOWED 10 AM TO 6 PM SATURDAY. SECTION 5: DESIGNATED REPRESENTATIVE(S) TO ACCEPT SERVICE OF SUMMONS AT THE APPLICANT'S BUSINESS OFFICE: Enter the names of at least two people who are authorized to accept summonses for his/her corporation and who are located at his/her business address. SignageSigns must be displayed at the work site or at 100-foot intervals along a series of excavations or continuous cuts indicating the name of the entity performing the work, the name of the entity for whom the work is being performed and, if applicable, the name(s) of the subcontractor(s). Applicants must first submit an Emergency Street Opening Permit Form. There is no fine associated with a Sidewalk Violation. Corner TreatmentThe two slope lines meeting at the intersection of the two building lines must drop from a common point at the building corner toward their respective curbs at a rate within the limits prescribed in the Highway Rules. REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. Applicants may provide complete copies of insurance policies instead of certificates of insurance. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. To release a VLT hold, the Permit Offices Plan Examination Unit must be contacted. To this end, NYC DOT has dedicated time and resources to enhance its own systems and coordination efforts. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. RESTORE CONCRETE BASE. For all permit applications including permit requests to work on embargoed streets through the HE period, the permittee will be automatically charged an additional $135 HE application review fee. During the final design stage of a city project, DDC will also hold a series of alignment meetings with the utilities and other agencies to inform them about proposed changes to the location of street infrastructure that would require facility relocation. For complete NYC DOT requirements regarding the performance of work in the street, please consult the Highway Rules and NYC DOT specifications. Following are the steps for permit application, review and issuance at the borough Permit Offices: There are borough permit offices in Brooklyn, the Bronx, Queens and Staten Island. To release a POL hold, the Division of Traffic Operations, Office of Street Lighting must be contacted. MAY WORK 7AM TO 8PM IN PARKING LANE ONLY TO OPEN UNDERGROUND STREET ACCESS COVERS FOR REPAIRS AND OR CABLE PULLS. WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. DESIGNATED AS COBBLESTONE STREET. WORK ALLOWED 8 AM TO 4 PM SATURDAY. Application for a canopy installation involves three major steps. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Notices of Violation (NOVs)/Summonsesare issued when there is a violation of laws, rules, regulations, specifications, or stipulations. Sidewalk flagsMust be 5'x 5' where feasibleAll flags containing substantial defects as defined in the Highway Rules must be replaced; patching of individual flags is not permitted. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. CONTRACTORS SHALL NOTIFY POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ABUTTING PROPERTY OWNERS 48 HOURS PRIOR TO CONSTRUCTION. AS PER STIPULATION MEC04-246 AND PROJECT PLANS DATED 04/30/04 WHICH MUST BE ATTACHED TO PERMIT. Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. NYC DOT accepts and processes applications by mail for sidewalk repair performed by private homeowners. NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE TYPE 204 PERMIT TO MAINTAIN THE FENCE & AN ACTIVE TYPE 215 PERMIT. The notice provisions specified in Section 2-02(g) of the Highway Rules are the minimum required for street operations. A street is considered to be protected for five years from the date it was last resurfaced or reconstructed. Permits (hazardous storage/operations) (718) 999-2457, New York City Department of Information Technology and Telecommunications (DoITT) New York, NY 10007 PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (. A list of the forms most commonly used during this process can be found inAppendix B, Forms. Entities that perform work in the streetsfrom utilities or contractors accessing subsurface infrastructure to property owners repairing sidewalksmust follow certain procedures when undertaking such work and must meet restoration requirements following its completion. PERMITTEE MUST EMAIL DEP AT. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHWEST QUADRANT OF THE INTERSECTION. Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. CTDOT_Traffic_STD.zip POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. Permits reissued after three business days must be subject to the full permit fee. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. 2016 CT.gov | Connecticut's Official State Website, regular Existing InfrastructurePermittees must not remove parking meters, traffic signs, street lights, street furniture, and similar items unless authorized on the permit. Cobra Head fixture on standard lamppost This chapter, which constitutes the current DOT Street Lighting Catalogue, outlines options for street and pedestrian lighting for New York City streets, bikeways, pedestrian bridges, pedestrian malls, plazas, and parks. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. (212) 839-8857 Fax: 212-720-3219, Manhattan USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. The canopy maintenance permit is from the "07" Canopy Permit series; the specific permit type to be applied for depends on the land use to which the canopy is being attached. Attn: Forestry Bronx, NY 10457 A HIQA inspector must be present during the restoration. With advance notice of NYC DOT's intent to work in a particular location, utility companies and other potential street excavators are better able to make arrangements to minimize potential conflicts or to leverage the opportunity to perform their work before resurfacing or reconstruction is complete. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. The requested permit must be appropriate for the type of work that is planned. View the most commonly issued. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. WORK FROM 7 PM FRIDAY THROUGH 6 AM MONDAY. Either response must be sent to NYC DOT's Division of Bridges at bridgeshold@dot.nyc.gov for review and release prior to commencing work. Outlined below are the basic application procedures for Building Operations/Construction Activity Permits. These applications can be submitted online using NYCStreets. 3.1 General Provisions For Construction-Related Permits Customer Service: (718) 802-3675, Manhattan The violation provides a property owner 75 daysto make repairs (see the Sidewalk Repairs section above for further details). Applicant Information (Corporation, LLC or LLP), 1C. DOT is committed to making our streets and sidewalks networks accessible to all, particularly aging New Yorkers and persons with disabilities. PROVIDE 5 FEET FOR PEDESTRIANS ON SIDEWALK OR IN CURB LANE. Borough Hall, 2nd Floor The Guarantee Period is considered to be three years on unprotected streets, and up to five years, but at no time less than three years, on protected (recently resurfaced or reconstructed) streets commencing on the restoration completion date. A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. The second option is available for applicants who do not have the technology to use the above procedure. Fax: (212) 860-1359 NYC DOT may revoke a permit without affording the permittee an opportunity to be heard prior to the revocation if NYC DOT determines that an imminent peril to life or property exists. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Applicants have two options to acquire an emergency street opening/excavation permit. NO NOISY OPERATIONS BETWEEN 12:01 AM AND 7:00AM. An overview of major permit categories, is provided below. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. Permit Bonds, as described in the Highway Rules, Section 2-02 (a) (4), should cover all permitted activities. Fax: (718) 858-0069, Manhattan NYCStreets system will automatically block an applicant from submission if insurance is not current. Where certification is unobtainable from the manufacturer, certification by the installer may be submitted instead. Kew Gardens, NY 11424 ). PERMITTEE MUST CONTACT DOT TRAFFIC & PLANNING OFFICE BY EMAIL AT. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND,YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. WORK 8 AM TO 7 PM MONDAY TO FRIDAY. Queens AND SUN. NYC DOT issues permits for two types of vaults: building vaults and transformer vaults. If the existing sidewalk is the structural roof of a vault or other opening, a DOB-approved plan for the restoration of the sidewalk, must be submitted as part of the application process. CONTAINMENT ONLY TO RESTRICT PARKING AND FOR STORAGE OF EXCAVATED MATERIAL/FILL. PERMITTEE MUST CALL/FAX OEM REGARDING EMERGENCY SITUATION. AND NYCTA. 1932 Arthur Avenue, 5th Floor If the installed canopy passes final inspection, HIQA releases the CAN hold on the canopy maintenance permit and notifies the original applicant. The pedestal is monolithically poured with the foundation. Check each borough in which the applicant expects to work. Upon completion of this action, the hold(s) will be released.